Jack & Jodie's Media Blog

A2 Music Video

Friday, 4 November 2011

Call Sheets

updated by Jack & Jodie at 11/04/2011
Labels: Jodie, Planning

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Links

  • Leigh Media A2

Labels

  • Construction (15)
  • Evaluation (13)
  • Feedback (8)
  • Final Product (3)
  • group meeting (14)
  • Jack (64)
  • Jodie (64)
  • Planning (45)
  • research (20)

Blog Archive

  • ►  2012 (24)
    • ►  February (3)
    • ►  January (21)
  • ▼  2011 (77)
    • ►  December (15)
    • ▼  November (36)
      • Production Logo
      • Screenshots from Editing
      • Group Meeting 24/11/2011
      • Website Draft
      • Website Requirements - Jodie
      • Website Requirements - Jack
      • Developed ideas
      • Digipak drafts
      • Group Meeting 21/11/2011
      • Analysis of a Digipak - Jack
      • Group Meeting 17/11/2011
      • The Positives And Negatives Of The Shot
      • Group Meeting 14/11/2011
      • On The Day
      • Preparation for the day of the shot
      • Crew Equipment List
      • Multiclip Editing Demo
      • Group Meeting 10/11/2011
      • Testing the Day for Night Effect
      • Group Meeting 07/11/2011
      • Analysis of a Digipak - Jodie
      • Weather Predictions for Filming
      • Analysis of a Website - Jack
      • Website Analysis Jodie
      • Digipak Influences- Jack
      • Group Meeting 04/11/2011
      • Call Sheets
      • Digipak Influences - Jodie
      • Production Schedule
      • Time Line - Franko - Night Time
      • Shot List
      • Test Shots
      • Animatic Story Board
      • Risk Assessment
      • Storyboard
      • Assets Table Collage
    • ►  October (16)
    • ►  September (10)
Simple theme. Powered by Blogger.